H-1 Factory Building, Mingshan Industrial Park, Gaoping Economic and Technological Development Zone, Jincheng City, Shanxi Province, China. +86-15921818960 [email protected]

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000

CASTING PROCESSES

Wind Power × Foundry · Market Pulse (2025)

Time : 2025-09-05

What’s happening in wind

Global wind power set a new record with 117 GW of new capacity added in 2024, according to the Global Wind Energy Council (GWEC).

In Europe, 16.4 GW of wind was built in 2024, 84% of which was onshore.

Looking ahead, the EU projects ~19 GW of new wind in 2025, supporting a faster energy transition.

Why this matters for castings

Each modern, land-based wind turbine typically uses large cast-iron components in the hub and bedplate. NREL data show current 3-MW-class machines use about 7–14 t of cast iron in the hub and 10–20 t in the bedplate~17–34 t per turbine—with even higher masses offshore. As turbines scale up, casting tonnage and complexity rise accordingly.

Bottom line: Record wind additions + EU’s 2025 build plans = sustained demand for high-integrity, heavy castings. “Wind × Foundry” isn’t a slogan—it’s a supply-chain reality.

Who we are

Kangshuo Electric Group Co., Ltd. (founded 2010) is a high-precision casting and 3D sand-printing specialist serving global wind OEMs and tier-1s. We deliver prototypes through mass production from a dedicated facility with automated molding, CNC machining, and in-house NDT—focused on hubs, bedplates, bearing housings, and nacelle structures (material grades per customer spec).

How we ensure quality & reliability

  • Process control: ISO 9001 & IATF 16949 systems; PPAP, APQP, and full material traceability.

  • Design-for-casting (DfC): Early collaboration to optimize gating/feeding and reduce hot spots; simulation-driven riser design to cut porosity risks.

  • 3D sand printing: Rapid cores/molds for complex geometries and urgent spares, compressing lead time and tooling cost.

  • Metallurgy & inspection: Spectrochemical analysis, microstructure evaluation, UT/RT/MT/DP, and dimensional CMM reports aligned to drawing GD&T.

  • Logistics readiness: Heavy-lift packaging, seaworthy preservation, and export documentation for 20-ton modules.

Why partners choose us

  • Volume + flexibility: From pilot runs to large series, with repeatable quality across multi-ton sections.

  • Time-to-market: Tool-less 3D sand printing slashes iteration cycles for new turbine platforms.

  • Cost & risk control: Casting-to-final-machining under one roof reduces supplier interfaces and transport risks.

  • Sustainability focus: Yield optimization and scrap reduction; options for recycled feedstock and energy-efficient melting.

Key data sources (independent & current)

  • Global installations 2024 (117 GW): GWEC Global Wind Report 2025 and related coverage.

  • Europe 2024 additions (16.4 GW, 84% onshore): WindEurope statistics.

  • EU 2025 outlook (~19 GW wind): European Commission estimate reported by Reuters.

  • Casting tonnage per turbine (hubs & bedplates): NREL, Large Castings for Wind Turbines (typical ranges for current land-based and offshore turbines).

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Phone
Message
0/1000